Interior plaster

the interior is well vorann, 14 days of my "vacation" are up. Almost a whole week, I primed the walls and ceiling and ground. on the ground floor the ceilings are finished and painted the walls papered with woodchip. Living room is painted finished and the lamps are mounted, missing only the laminate. I'm cooking with tiled in, floor tiles and are ready on Wednesday or Thursday I'll get the kitchen and start to build them. The kitchen we have collected at IKEA. Bathroom is tiled top almost finished, missing the floor, bathtub and shower tray stand. With the flush valve of the bathtub I embarked on what was there two days rumgepriemt smooth turn, x-times to Hardware driven and over again is missing an angle or a spacer. dan a box build and dressing up where the mixer disappears inside. And finally I was able to exchange the bath because she was damaged.


bathroom before


and now!
tiled kitchen with started.


and there is even a counter.
living and dining room:





Tuesday, October 27, 2009

Hotmail Overactive Thyroid



outer wall is drann, work is almost completed

Monday, October 26, 2009

Sadler Oxford Vocabulary Level E Workshop

interior

The interior work is nearly completed by (Danwood pages).
The guys are so fast from what I did not come with afterward review.
has now been renewed and my bathroom window and the dormer is clad, the last plasterboard joints are filled, window sills are all mounted on the inside everything ready.
electrician and energy were there and have the E-connection made and the next day, the electricity meter installed. And some pictures.


Our living room with a view from the balcony in the garden!
hallway and stairs.
guest / study
a room upstairs
dip in the floor still with the wrong window
stairs to the EC

Monday, October 19, 2009

Bushnell 3200 Elite 5x15x40

half

So 14 days to, topping was the same on 3 October, Mr. Kriesel has kept a really great judge's decision. Then the new home was poured properly, have extra real good Polish vodka worried. In the next few days there was really bustle in the house, 5 craftsmen, two plumbers and two electricians on the potter sometimes until midnight. The guys do really good work.
Made
was until now.
  • covered roof
  • facade transitions dressed and ground built
  • dormer from the porch and bathroom and covered
  • used bathroom window (fits only unfortunately, the window is a bit too small. But it will still be exchanged)
  • wastewater - and laid water pipes, electrical equipment installed
  • was isolated floors and underfloor heating designed towel connected
  • water meter installed
  • screed introduced
  • walls are mostly covered and vorgespachtelt
and now some pictures:
view from the front of the porch
rear view of the bay window and the bathroom, pictures are from 02.10.2009
over again with roof tiles and partly covered
also from behind a few days after the ceremony.
water lines are down the hall to the kitchen and heating to the heater in the porch
there in the "Garden "is the excavator for the hole in the ground where the absorber mats come inside for the heat pump
The heat pump and the absorber mats
heating pipes in the living room
heating pipes and distribution at the top
and screed on it

Friday, October 9, 2009

Professor Letter Of Recommendation For Sorority

house construction

The first truck, there stands our ground floor.
The cut sheets are designed on the base plate and glued, then the walls with the chalk line drawn and then it happened. Peter turns to the great tap water and it pours with rain. The workers put on your wet protection and we continue unaffected.
And then it goes very fast, despite the rain, the first wall and is already the next one is served. 3 hours later the ground floor is only the cover (cover) on it,

porch to the front door.

And on we go with the top floor, the gable wall is set, the remaining walls to tighten and everything. Roof parts lay ready for today. The workers have pulled 12 hours,
is so that the hut to!
our house the next morning.

Wednesday, October 7, 2009

Images To Put On Baby Clothes

Our house is built

It is where our house is, first Aufstellbeginn October 2009 at 07:00 clock. We have been
04:00 clock on his legs have almost all night with excitement, not to make eye. I'm at 06:00 clock fresh bread from the bakery and brought Bianka already cooked all morning coffee. At 06:45 clock, we are fully packed with coffee and sandwiches on the site. The workers are there, the crane is ready since the night before. Only at 07:30 clock is still not a Polish truck to see. Meanwhile, the construction manager and the phone is rooted in the ear, no one knows where are the trucks!

Shortly after 08:00 clock he finally reaches a logistician in the works, jumps into his car and drives off, because we are all helpless. 30 minutes later he is back with four tractor-trailers in tow. They've got an address from another site in the neighboring town and have since moved out. Then it can go so go!

Monday, October 5, 2009

Nursery, What To Put On Closet Doors

Update

after a long time I sign up again.

- The base is now completed and accepted
- the whole Land stories are done (sharing etc)
- was sewage and water already connected, just missing
water meter - preliminary discussion with the supervisor is also done
- then waiting to ask, again and again when the delivery date and wait again!

Then finally, on 4 September the desired letter on 1 October is our home!
the 4 weeks until there have been damn long, now the toilet and rubbish containers and ordered again waiting.

Friday, October 2, 2009

How Much Does An Abortion Cost In Belgium?

bottom plate

Here are some pictures of the bottom plate.

view of the future Utility room, strip foundations with drains and media supply

pour the floor slab completed, reinforcement + insulation and sheathing.

The floor slab is poured, as fit to have lots of pure concrete (18 cubic meters, it was with us).

floor slab is poured and finished deducted.

Friday, August 14, 2009

Average Salary For A Waiter At Bonefish

we go!

Finally what is seen, not only accounts & Bills. Last Saturday I would take it out on the property and cut down the whole herb was by now over 1 half m high.
10:08:09 On Monday, the Baustromkasten set up and on Tuesday was the meter installed. Wednesday came the surveyors with the base plate manufacturer for setting out on Thursday and was then going at last.

Monday, July 13, 2009

Calories In A Slimfast Shake

TV Report about Danwood

From Mr. Kriesel I have just read the morning on SAT1 07.14.2009 at 23:20 in the series "24 Hours", a contribution is sent over Danwood, including also there is the factory in Poland are shown. I would imagine that it will be interesting.