Interior plaster

the interior is well vorann, 14 days of my "vacation" are up. Almost a whole week, I primed the walls and ceiling and ground. on the ground floor the ceilings are finished and painted the walls papered with woodchip. Living room is painted finished and the lamps are mounted, missing only the laminate. I'm cooking with tiled in, floor tiles and are ready on Wednesday or Thursday I'll get the kitchen and start to build them. The kitchen we have collected at IKEA. Bathroom is tiled top almost finished, missing the floor, bathtub and shower tray stand. With the flush valve of the bathtub I embarked on what was there two days rumgepriemt smooth turn, x-times to Hardware driven and over again is missing an angle or a spacer. dan a box build and dressing up where the mixer disappears inside. And finally I was able to exchange the bath because she was damaged.


bathroom before


and now!
tiled kitchen with started.


and there is even a counter.
living and dining room:





0 comments:

Post a Comment