The first truck, there stands our ground floor.
The cut sheets are designed on the base plate and glued, then the walls with the chalk line drawn and then it happened. Peter turns to the great tap water and it pours with rain. The workers put on your wet protection and we continue unaffected.
And then it goes very fast, despite the rain, the first wall and is already the next one is served. 3 hours later the ground floor is only the cover (cover) on it,
And on we go with the top floor, the gable wall is set, the remaining walls to tighten and everything. Roof parts lay ready for today. The workers have pulled 12 hours,
is so that the hut to!
our house the next morning.