Monday, October 19, 2009

Bushnell 3200 Elite 5x15x40

half

So 14 days to, topping was the same on 3 October, Mr. Kriesel has kept a really great judge's decision. Then the new home was poured properly, have extra real good Polish vodka worried. In the next few days there was really bustle in the house, 5 craftsmen, two plumbers and two electricians on the potter sometimes until midnight. The guys do really good work.
Made
was until now.
  • covered roof
  • facade transitions dressed and ground built
  • dormer from the porch and bathroom and covered
  • used bathroom window (fits only unfortunately, the window is a bit too small. But it will still be exchanged)
  • wastewater - and laid water pipes, electrical equipment installed
  • was isolated floors and underfloor heating designed towel connected
  • water meter installed
  • screed introduced
  • walls are mostly covered and vorgespachtelt
and now some pictures:
view from the front of the porch
rear view of the bay window and the bathroom, pictures are from 02.10.2009
over again with roof tiles and partly covered
also from behind a few days after the ceremony.
water lines are down the hall to the kitchen and heating to the heater in the porch
there in the "Garden "is the excavator for the hole in the ground where the absorber mats come inside for the heat pump
The heat pump and the absorber mats
heating pipes in the living room
heating pipes and distribution at the top
and screed on it