The interior work is nearly completed by (Danwood pages).
The guys are so fast from what I did not come with afterward review. has now been renewed and my bathroom window and the dormer is clad, the last plasterboard joints are filled, window sills are all mounted on the inside everything ready.
electrician and energy were there and have the E-connection made and the next day, the electricity meter installed. And some pictures.
Our living room with a view from the balcony in the garden!
hallway and stairs.
guest / study
a room upstairs
dip in the floor still with the wrong window
stairs to the EC
0 comments:
Post a Comment