Here are some pictures of the bottom plate.
view of the future Utility room, strip foundations with drains and media supply
pour the floor slab completed, reinforcement + insulation and sheathing.
The floor slab is poured, as fit to have lots of pure concrete (18 cubic meters, it was with us).
floor slab is poured and finished deducted.