Once we had decided, a construction supervisor Please be careful looking I was a little on the internet and found one. The rates were nearly identical in the different supervisors and were at about 150 € net per visit. We agreed on six visits to the site. I then met with the engineer on site. We then informed him the date for the start of construction (01/10/2007) with. He wanted to watch them work on the base.

Last Friday, the 12.10.2007, I then called the supervisor. Until then he had been two site visits have taken. Well at least I called it and he said that he will then go out that day for the first time. He had the days before holidays. I thought that was very wrong, we do not even teach it. Of course he would, of course, only to face the bill for this appointment. However, I do not know if you still in the phase can detect all defects.
On Friday evening he then sent an email with an extensive photo report. He described that the implementation of high quality.