Tuesday, February 5, 2008

Chest Infection How Many Days Off

sewage connection

On 01 December we were again on the site. The sewer connection, we were aiming to make on their own performance. These are the civil engineering company Haase & Pollack has kindly left open the chute, in which there was already water and electricity.

From Dabendorf we have borrowed a wheel loader for the day, my father can use such a thing that is pretty good. As seen in the pictures, we had real lousy weather. My father and I dug a drainage of the pipes and hand.







Green, Lavender And White Bathroom

Again a post

Unfortunately, I have less and less time at the moment, so come the posts a little late (better than never). It has obviously done a lot on the site. The decrease moves ever closer and is scheduled for late February. At the moment the tile is still in there, but should be ready end of the week. Next week finds a pre-acceptance rather than with the construction manager.