Not yet away from the window
It looks like that the blog is dead, the only problem is that in Glienick still no broadband Interet. With my narrow-band connection, I can not post anything.
We have now lived since the end of February 2008 in the house and I must say that we actually had no major problems. were a few minor complaints are there, but the deficiencies were rectified immediately.
Thursday, July 24, 2008
Tuesday, February 5, 2008
Chest Infection How Many Days Off
sewage connection
On 01 December we were again on the site. The sewer connection, we were aiming to make on their own performance. These are the civil engineering company Haase & Pollack has kindly left open the chute, in which there was already water and electricity.
From Dabendorf we have borrowed a wheel loader for the day, my father can use such a thing that is pretty good. As seen in the pictures, we had real lousy weather. My father and I dug a drainage of the pipes and hand.
On 01 December we were again on the site. The sewer connection, we were aiming to make on their own performance. These are the civil engineering company Haase & Pollack has kindly left open the chute, in which there was already water and electricity.
From Dabendorf we have borrowed a wheel loader for the day, my father can use such a thing that is pretty good. As seen in the pictures, we had real lousy weather. My father and I dug a drainage of the pipes and hand.
Green, Lavender And White Bathroom
Again a post
Unfortunately, I have less and less time at the moment, so come the posts a little late (better than never). It has obviously done a lot on the site. The decrease moves ever closer and is scheduled for late February. At the moment the tile is still in there, but should be ready end of the week. Next week finds a pre-acceptance rather than with the construction manager.
Unfortunately, I have less and less time at the moment, so come the posts a little late (better than never). It has obviously done a lot on the site. The decrease moves ever closer and is scheduled for late February. At the moment the tile is still in there, but should be ready end of the week. Next week finds a pre-acceptance rather than with the construction manager.